Skip to main content
Question

Scheduler Date/Time Overrides on multiple dates

  • May 19, 2025
  • 0 replies
  • 3 views

Abbie Fuller

I have an event scheduled over multiple days (Summer 2025 Mini Session). Two of the days originally had the same availability but now I would like to change that and I can’t edit just one of the dates/times without either removing the one date completely or the time from both dates. Am I missing something? Is there a way to remove a 6pm timeslot from one date without changing the other 6pm timeslot (that is already booked)?